Slab Rebar Quantity Calculator

Estimate straight reinforcing bars, cut lengths and nominal steel weight for both directions of a rectangular slab grid.

Prefer us on Google

Enter maximum center-to-center spacing from your plans. Use the same edge offset and end setback on both sides. This takeoff covers straight runs only.

Total straight bar runs

34runs

503.5 ft total · 336.34 lb nominal weight

Running along length
13 × 19.75 ft
Running along width
21 × 11.75 ft
Nominal steel weight
336.34 lb
  • Free to use
  • US bar sizes
  • Working shown
  • Made for phones
Prefer us on Google

How we calculated it

Follow the count, length and weight in both directions.

What you measure

Slab lengthSlab width
Bars running along the length are counted across the width. The other set is counted across the length.

Your inputs at a glance

InputHow it is used
Maximum spacingSets the largest permitted center-to-center gap in the takeoff
Edge offsetLocates first and last bar centerlines
End setbackDetermines the cut length of each straight run
Bar sizeSets the nominal weight per foot for that direction
LayersRepeats the same grid quantities
  1. 1. Find the centerline span

    Subtract twice the edge-to-centerline offset from the slab dimension across each set of bars.

  2. 2. Count the runs

    Divide span by maximum spacing, round the number of spaces up, then add one bar per layer.

  3. 3. Calculate cut lengths

    Subtract twice the end setback from the dimension each bar runs along.

  4. 4. Add total footage

    Multiply cut length by the number of runs in each direction.

  5. 5. Estimate nominal weight

    Multiply each direction’s footage by its own nominal weight per foot, then add.

Fits evenly spaced runs between the specified outer centerlines. Actual spacing can be smaller than the entered maximum.

Worked examples

Load a sample to check both directions. The dimensions are illustrative.

20 × 12 ft grid

20 × 12 ft · 12 / 12 in spacing · #4 / #4 · 1 layer(s)

Runs along length
13
Runs along width
21
Total footage
503.5 ft
Nominal weight
336.34 lb

Different spacing by direction

30 × 16 ft · 12 / 18 in spacing · #4 / #5 · 1 layer(s)

Runs along length
17
Runs along width
21
Total footage
833.33 ft
Nominal weight
680.04 lb

Two identical layers

24 × 16 ft · 12 / 12 in spacing · #5 / #5 · 2 layer(s)

Runs along length
34
Runs along width
50
Total footage
1,588 ft
Nominal weight
1,656.28 lb

Exact spacing division

10 × 10 ft · 12 / 12 in spacing · #3 / #3 · 1 layer(s)

Runs along length
11
Runs along width
11
Total footage
220 ft
Nominal weight
82.72 lb

Why use this calculator

What you getConstructlifyWeight only
Straight runsCounted separately in two directionsRequires a known total length
Bar sizesSelect a size for each directionUses one entered weight rate
LayersRepeats identical grid quantitiesEnter combined footage
OutputCount, cut length, footage and weightWeight

US bar sizes

Choose nominal size #3 through #11.

Two spacing inputs

Enter different maximum spacing by direction.

Identical layers

Multiply the takeoff by the number of matching grids.

Working shown

See how spacing, lengths and weights are calculated.

Copy result

Copy a summary for your takeoff notes.

Made for phones

Check quantities while measuring.

Quick reference tables

Bar sizeNominal lb/ft
#30.376
#40.668
#51.043
#61.502
#72.044
#82.670
#93.400
#104.303
#115.313

Nominal unit weights for takeoff. See the Gerdau straight rebar specification and confirm the bar specification with your supplier.

Slab rebar quantity guide

Start with the reinforcement plan

Enter slab dimensions and the bar size and maximum spacing specified in each direction. Use one estimate per rectangular area with a consistent layout.

Measure placement separately from cut length

The edge offset is measured to the centerline of the outside bar, whereas the end setback is measured to the end of the straight bar. These distances affect different parts of the calculation. If they vary by edge or direction, separate the grid in your takeoff.

Count rooms or areas with different grids separately

Use the layer input only for identical grids. Measure different top and bottom layers independently. Openings, thickened edges, local reinforcement and other variations need their own takeoff.

Turn footage into an order

A run is a continuous line in the grid. If stock bars are shorter than the run, use the project’s approved splice and cut schedule. This estimate excludes stock cutting waste, laps, hooks and bends.

Check the layout against the plans

The calculator estimates material quantity from supplied details. Use the approved drawings for cover, spacing, bar size and splices.

Frequently asked questions

Why is one added to the number of spaces?

A row of bars has a bar at each end. Ten spaces therefore need eleven bars.

What does maximum spacing mean?

When the span does not divide evenly, the tool rounds the number of spaces up and distributes them evenly.

Is a run one stock piece?

A run is the line from one end to the other. Check available stock lengths and your approved splice schedule before ordering.

Does the edge offset mean clear cover?

The input measures to the bar centerline. Clear cover measures to the bar surface. Use the centerline dimensions in your plans.

Does it include overlaps and bends?

The numbers cover straight runs only. Take off laps, hooks, bends and waste separately.

How do I handle different layers?

Calculate each layer separately when the size, spacing or dimensions differ. Use the layer multiplier for identical grids.

From the blog

All articles

How to read grid spacing

Read the guide

Check which way each bar set runs. The spacing is measured perpendicular to the bars.

How to group identical bar runs

Read the guide

Group by size, cut length and direction. Keep layout areas and layer schedules separate when their details differ.

What to check before buying rebar

Read the guide

Compare the straight takeoff against current fabrication details and available stock lengths. Include approved splices and cutting allowance separately.