Concrete Footing Volume Calculator

Estimate the concrete for rectangular, round and tube formed footings using your project dimensions.

Prefer us on Google

Use the planned inside dimensions. Enter different sizes as separate groups.

Concrete needed, including wastage

1.449yd³

39.111 ft³

Base volume
35.556 ft³
Extra concrete
3.556 ft³
Premix bags
66 × 80 lb
  • Free to use
  • Feet and inches
  • Working shown
  • Made for phones
Prefer us on Google

How we calculated it

The working below updates as you change the footing shape and dimensions.

What you measure

Length × widthInside diameterFill to planned depth
Use the inside width of a rectangular form or the inside diameter of a tube, and measure the fill depth.
Volume = Footprint × Depth × Quantity

Your inputs at a glance

InputWhat to enterUnits
LengthLength of a straight rectangular sectionft
Width or diameterInside size of the formin
DepthActual concrete fill depthin
QuantityNumber with identical dimensionswhole number
WastageExtra for your site conditions%
Bag yieldVolume of mixed concrete per bagft³
  1. 1. Convert the measurements

    Width, diameter and depth in inches ÷ 12

  2. 2. Find the footprint area

    Rectangle = length × width. Circle = π × radius².

  3. 3. Calculate the base volume

    Footprint area × depth × quantity

  4. 4. Add wastage

    Base volume × (1 + wastage ÷ 100). Divide ft³ by 27 to get yd³.

  5. 5. Estimate premix bags

    Adjusted ft³ ÷ yield per bag, rounded up

Wastage is applied once. Bag counts use the unrounded volume.

Worked examples

Select Load in calculator to try any example.

Continuous strip footing

40 ft long × 16 in wide × 8 in deep, 1 footing(s), 10% wastage

Concrete
1.449 yd³
Premix
66 × 80 lb

Illustrative dimensions only. Use your project’s plan and measured form sizes.

Four rectangular pads

2 ft long × 24 in wide × 12 in deep, 4 footing(s), 5% wastage

Concrete
0.622 yd³
Premix
28 × 80 lb

Illustrative dimensions only. Use your project’s plan and measured form sizes.

Six round tube forms

12 in inside diameter × 36 in deep, 6 footing(s), 10% wastage

Concrete
0.576 yd³
Premix
26 × 80 lb

Illustrative dimensions only. Use your project’s plan and measured form sizes.

Two wide round footings

24 in inside diameter × 12 in deep, 2 footing(s), 0% wastage

Concrete
0.233 yd³
Premix
11 × 80 lb

Illustrative dimensions only. Use your project’s plan and measured form sizes.

Why use this calculator

What you getConstructlifyManual calculation
UnitsEnter feet and inches directlyConvert before multiplying
ShapesRectangular and round modesChoose the formula yourself
WastageApplied once to the measured volumeAdd separately
Premix bagsPreset or custom yield and whole bagsDivide and round up yourself

US ordering units

Read results in cubic yards and cubic feet.

Two shapes

Estimate rectangular sections or round tubes.

Working shown

Follow each calculation using your inputs.

Adjustable wastage

Set the allowance for your job.

Copy result

Copy yards, feet and bag count.

Made for phones

Use the calculator while measuring.

Quick reference tables

Premix bagExample yield
40 lb0.3 ft³
50 lb0.375 ft³
60 lb0.45 ft³
80 lb0.6 ft³
90 lb0.675 ft³

QUIKRETE Concrete Mix data sheet. Use the label on the mix you actually buy.

Concrete footing volume guide

Measure the planned concrete space

For a strip or pad, measure the inside length and width of the form and the concrete depth. For a tube, use its inside diameter and the planned fill depth. The tube may be taller than the part you intend to fill.

Split irregular runs into sections

Divide stepped runs into blocks with consistent widths and depths. At corners or intersections, count the shared volume once. For a pier over a wider pad, count the shaft above the pad separately from the pad itself.

Keep base volume and allowance separate

Base volume is the measured space to fill. Your allowance accounts for site conditions such as uneven excavation and spillage. Measure the forms before ordering and adjust the allowance if conditions differ from the plans.

Order by volume or bag yield

For ready mix, use the result in cubic yards and confirm delivery quantities, order increments and minimum charges with the supplier. For bagged concrete, enter published mixed yield and round up to whole bags.

Use the dimensions specified for your project

This is a quantity estimate. Footing dimensions, placement, reinforcement and concrete specification come from the approved project plans.

Frequently asked questions

How do I calculate concrete for a strip footing?

Multiply length, width and depth in feet. Apply your allowance, then divide by 27 to convert cubic feet to cubic yards.

What diameter should I enter for a tube form?

Enter the inside diameter, then enter the depth of the concrete fill.

Can I calculate a pad and pier together?

Calculate them as separate sections. Where they overlap, count the shared space only once.

Why does the bag count round up?

The calculator divides the unrounded volume by the mixed yield. A partial bag in the estimate becomes a whole bag in the purchase quantity.

Does this tell me how deep or wide a footing should be?

Use the dimensions specified for the project. This calculator estimates concrete quantity from dimensions you enter.

How do I handle footings with different sizes?

Calculate and record each group separately. Add the volumes before you finalize a common ready mix order or bag purchase.

Should I use the default allowance?

It is an example input. Adjust it for the measured forms, uneven excavation and expected placement losses.

From the blog

All articles

How to measure tube forms

Read the guide

Measure across the inside of the tube and record the fill depth. Group identical tubes together. Confirm the planned bottom and top elevations before ordering.

How to count corners once

Read the guide

Sketch the strip footing as separate straight runs. For overlapping corners, shorten one measured section by the shared length. Estimate any extra depth as a separate block.

How to compare bags and ready mix

Read the guide

Use published bag yield for the bag estimate. For ready mix, confirm the supplier’s minimum delivery and ordering increments. Compare total cost and placement logistics.