Excavation and Earthwork

Excavation Volume Calculator

Estimate rectangular excavation volume in cubic yards with soil swell.

Use this calculator Free to use · Clear working · Mobile friendly

Project estimate

Enter your details

Adjust the measurements and assumptions for your project. Review the result before using it to plan materials or costs.

Excavation Volume Calculator

Estimate in-place soil volume and loose volume with swell.

US customary units

Rectangular excavation. Sloped sides and soil swell vary by project.

Estimated result

—yd³

  • Quick estimates
  • Formula explained below
  • Use on phone or desktop

Simple process

How to use this calculator

Work through the inputs, check the assumptions and keep the result with your project notes.

  1. 01

    Enter project measurements

    Use the dimensions and quantities shown on your plans or measured on site.

  2. 02

    Set allowances and options

    Choose the relevant units, material details or waste allowance for this estimate.

  3. 03

    Review the result

    Check the units and calculation notes below, then confirm quantities with your supplier or project team.

Calculation guide

Formula, examples and answers

Use the guide to understand the method, follow a worked example and check common questions before you act on the estimate.

How to use the excavation volume calculator

This excavation volume calculator turns the measurements and options you enter into a practical planning estimate. Use the dimensions from your plans or check them on site, then review the result and its units before you use it.

  1. Excavation length, width, depth and soil swell allowance.
  2. Adjust any allowance or material option to match the job.
  3. Check the result against the worked example and notes below.

For projects with different dimensions or conditions, calculate each section separately and combine the results afterward.

Excavation Volume Calculator formula and assumptions

Calculation method

In-place volume (yd³) = length (ft) × width (ft) × depth (ft) ÷ 27. Loose volume = in-place volume × (1 + swell % ÷ 100).

The calculator uses the values entered and the assumptions stated here. Check product labels, drawings or supplier information when those specifications differ from the example.

Worked examples

  • 30 ft × 10 ft × 4 ft excavation

    Bank volume is 1,200 ft³, or 44.44 yd³. Apply a 20% swell allowance.

    Estimate: About 53.33 loose yd³.

  • 20 ft × 8 ft × 3 ft excavation

    Bank volume is 480 ft³, or 17.78 yd³. Apply a 20% swell allowance.

    Estimate: About 21.33 loose yd³.

The examples are rounded for readability. Enter your own project values for a fresh estimate.

Measurement and planning notes

  • This model assumes straight, rectangular sides and a uniform depth.
  • Swell varies by soil type, moisture and excavation method; ask the earthwork contractor for a site-specific factor.
  • Sloped sides, benches, trenches with changing sections and stockpile compaction need separate calculations.

Field tip: Keep the measurement units consistent and note the assumptions you used. A small input check can prevent a larger ordering error.

Frequently asked questions

Does it calculate sloped excavation sides?

No. It assumes a rectangular prism. Measure sloped or stepped portions separately or use a method that accounts for their geometry.

What does swell percentage mean?

Swell is the increase in volume when soil is loosened by excavation. It estimates loose haul or stockpile volume from the in-place volume.

Does swell account for compaction?

No. Compaction changes volume again and depends on soil and placement. Use a project-specific compaction factor when estimating placed fill.

Can I use this to price hauling?

Use the loose-volume result as a planning estimate, then confirm truck capacity, soil classification, access and haul terms with the contractor.

Excavation measurement and hauling guide

Measure the cut, calculate the in-place volume and apply the project’s swell allowance to estimate loose soil.

Measure the cut in feet

Use the planned excavation length, width and depth. Measure the cut shown on the drawings, including any working space already specified. A finished footing or pipe dimension can differ from the size of the excavation. Record each measurement and its location so changes to the design can be reflected in the estimate.

Use depth from the existing surface

Depth is the vertical difference between the existing surface and the planned bottom. For example, a depth of 3 ft 6 in is 3.5 ft. If the ground elevation changes, divide the cut into sections with representative depths and record how each was measured.

Divide an irregular cut into sections

Sketch the plan and split an L-shaped trench or stepped excavation into non-overlapping sections. Compute each section separately and add the volumes. At intersecting trenches, assign the shared corner to one section to avoid counting the same material twice.

Distinguish in-place and loose soil

In-place volume describes material in the ground. Loose volume describes it after digging and includes the selected swell allowance. Use the in-place figure for the geometric takeoff and the loose figure as the starting point for a haul or stockpile estimate.

Run a separate estimate for each material

If the cut includes distinct layers such as topsoil and subsoil, measure their average thicknesses separately where practical. Apply each material’s project-specific swell value before adding loose volumes. Keep the subtotals with the estimate to make quantities easier to reconcile.

Check sloped or stepped geometry

A rectangular calculation represents a constant cross-section. For a sloped cut with known top and bottom widths and a uniform depth along its length, calculate the trapezoidal cross-sectional area and multiply by length. Use project drawings or a surveyed takeoff when the shape changes in several directions.

Keep excavation and backfill separate

Record how much space the finished structure, bedding and other permanent materials will occupy. Estimate backfill for the remaining space using the specified placement basis. Loose excavation volume and compacted fill volume describe different material states.

Translate loose volume into haul quantities

Divide loose cubic yards by the usable volume per load and round up to estimate trips. For 54 loose yd³ and 10 yd³ per load, the volume estimate is six loads. Confirm usable payload and whether the quote charges by load, volume or weight.

Worked example with stepped depths

A 15 × 4 ft trench section at 3 ft deep contains 180 ft³. A separate 10 × 4 ft section at 2 ft deep contains 80 ft³. Together they contain 260 ft³, or 9.63 yd³ in place. At 20% swell the loose volume is 11.56 yd³.

Worked example with different materials

For a 20 × 10 ft cut, the top 1 ft contains 200 ft³ and the next 2 ft contain 400 ft³. With example swell inputs of 10% and 25%, the loose layers contain 220 ft³ and 500 ft³. Together they make 720 ft³, or 26.67 loose yd³.

Soil swell reference

Loose volume for example swell inputs. Use the allowance specified for your material.
Swell inputFrom 10 in-place yd³From 40 in-place yd³
0%10 yd³40 yd³
10%11 yd³44 yd³
20%12 yd³48 yd³
30%13 yd³52 yd³

Excavation planning FAQs

Why divide cubic feet by 27?

A cubic yard measures 3 ft on each side, so it contains 27 ft³.

Can I enter a fractional depth?

Yes. Convert inches to feet before entering the value. For example, 18 inches is 1.5 ft.

What does zero swell show?

The loose estimate equals the in-place volume when you enter 0%.

Can I add several trench runs?

Yes. Calculate each run, exclude shared intersections and add the totals. Keep materials with different swell allowances separate until their loose volumes have been calculated.

How do I estimate a trench that gets deeper along its length?

For a uniform width and a steady change in depth, use the average of the depths at the two ends. Split the trench into sections when the change is irregular.

Can I use this result to estimate truckloads?

Use the loose volume and divide by the hauler’s usable capacity. A load may be limited by weight before the body is full.

Does the result include material weight?

It estimates volume. To estimate weight, use a project-specific density that matches the material condition and the volume basis.

Can I use loose soil volume for compacted backfill?

Estimate the compacted space separately. Use the project’s material and compaction information to convert the quantity to the supplier’s ordering basis.

Built for practical planning

Make the estimate easier to use

See how it works

The formula and worked example explain where the result comes from.

Check the assumptions

Allowances and product details can change the quantity you need.

Plan with confidence

Use the estimate as a clear starting point for your project conversation.