How to estimate concrete for a slab
Read the guide
Measure the length, width and thickness. Convert them to consistent units, multiply to find volume and check the pour allowance.
Estimate ready mix concrete costs using your supplier’s price per cubic yard and quoted fees.
The working below uses your yardage, quote and estimated tax.
Confirm order increments, minimum billable yardage and which charges apply to your order.
| Input | What to enter |
|---|---|
| Volume | Measured volume before wastage |
| Unit rate | Quoted dollars per cubic yard |
| Fees | Flat amounts from your quote |
| Tax | Estimated percentage and taxable items |
Cubic feet ÷ 27 gives cubic yards
Base yardage × (1 + wastage ÷ 100)
Total yardage × quoted price per cubic yard
Delivery + short-load fee + other charges
Taxable amount × entered tax rate. Add the tax to the subtotal.
The tool uses unrounded yardage for material cost. Monetary amounts are rounded to cents.
These rates illustrate the calculation. Replace them with your own supplier quote.
2 yd³ at $150.00/yd³, 5% wastage
4 yd³ at $155.00/yd³, 10% wastage
6 yd³ at $160.00/yd³, 5% wastage
81 ft³ at $145.00/yd³, 0% wastage
| What you get | Constructlify | Price per yard alone |
|---|---|---|
| Concrete quantity | Adds your planned wastage | Base volume only |
| Delivery fees | Separate line items | Excluded |
| Tax basis | Concrete only or concrete and fees | Excluded |
| Result | Itemized delivered estimate | Material subtotal |
Enter cubic yards or cubic feet.
Apply a project allowance once.
Enter delivery, short-load and other fees.
Choose what to include in the taxable amount.
Copy the yardage and estimated total.
Compare a quote while on site.
| Quote item | Confirm with supplier |
|---|---|
| Concrete rate | Price per cubic yard and mix specified |
| Delivery | Fee per order or trip |
| Small loads | Threshold, minimum charge or quoted short-load fee |
| Fee | What to include |
|---|---|
| Short-load | Enter the quoted total for the order |
| Other | Pump, waiting or other charges only if quoted |
| Tax | Use the supplier’s estimate and taxable charges |
| From | To |
|---|---|
| 27 ft³ | 1 yd³ |
| 54 ft³ | 2 yd³ |
| 81 ft³ | 3 yd³ |
Use the measured pour volume in cubic feet or cubic yards. Add wastage here only when it was excluded from your takeoff.
Enter the supplier’s rate per cubic yard for the mix specified on the project. Confirm whether their billing increments or minimum order change your billable yardage.
Enter the total quoted fees for the order, including multiple trips if applicable. If a supplier charges minimum billable yardage instead of a flat short-load fee, calculate the charge from the quote before entering it. Avoid counting it twice.
Use the tax rate and taxable charges shown on the quote. Compare delivered estimates using the same scope. See the NRMCA ready mix ordering guide for a supplier checklist. Add placing labor, pumping or other services only when you intend to include them in this budget.
Yes. Enter the base yardage and add wastage here, or enter already adjusted yardage with wastage set to zero.
The values demonstrate the calculation. Enter the rate provided for your project.
Enter the supplier’s quoted charge. The calculator does not infer a threshold or rate.
Enter labor or pumping under other charges if you want to include a known quote in your estimate.
Select concrete only or concrete and fees based on the quote. Confirm the taxable amount with the supplier.
It keeps the quantity unrounded when calculating material cost. Check supplier billing increments before placing an order.
Measure the length, width and thickness. Convert them to consistent units, multiply to find volume and check the pour allowance.
Compare mix, yardage, delivery, fees and tax on the same basis. Ask about billing increments and minimum order conditions.
Confirm site access, scheduled trucks, fees and the party responsible for placement and washout.
Your answer helps us improve it.
Try the related calculators below for the next stage of your build.
We read every message and use it to improve our tools.